<< Click to Display Table of Contents >> Navigation: Scheduling > Daylists |
Daylists are used to schedule Templates at regular fixed times along the schedule timeline, for example, 09:00, 12:00 and 17:00 every weekday. This enables repeat sequences to be used many times by scheduling Daylists rather than individual Templates.
Daylists are a feature of manual scheduling. |
Add names for your Daylists, and press ‘Create’ to save each. These will now be listed:
Click the name of a Daylist in order to add Templates to it, at required times. Any empty spaces will be filled by the autoscheduler.
The appearance is very similar to the Live Schedule, but is static. Select the hour to view, zoom in and out, and scroll within the selected hour.
Intervening on the Schedule: Manual Addition and Removal of Templates and Fit to Fills
Where in the day to view?
To view the part of the day you require, click on the hour (1) and minute segment (2) in the top grey bands.
What start time?
To select where you want the item to be inserted, click on the timeline (3). This segment will highlight in dark red.
Insert a Template or Fit to Fill
Now select the Template (4) or Fit to Fill you want to insert, and under ‘Actions’ select Schedule (5):
Alternatively, double-click on a timeslot to insert selected items.
When you select one item from the list of Templates, you will see on the left, under ‘Templates’, available actions: either to Schedule the item or to Pull (remove all) future (scheduled) instances of selected Templates. If you choose to pull Templates, a prompt will show how many will be pulled with the option to Confirm or Cancel. A confirmation message will show how many have been pulled.
If an inserted Template is also a pooled asset, even though we ensure it plays at the given time every weekday, if there is Contract capacity left after all its manual scheduling, further plays will be distributed automatically. Its Category will ensure separation from other items of the same Category.
To delete an item, select it and use the yellow button thrown up:
Unlike asset components, Daylists and Daylist Schedules can be deleted (‘Destroyed’), but whilst you can edit the content lists, you cannot edit the name:
Import Daylists from CSV
In some circumstances it may be more efficient to create Daylist allocations in a separate CSV list (e.g. in Excel, and save as: ‘CSV (Comma delimitted) (*.csv)’). To do this, the timeslots and Screen names (columns) and Template names (rows) must be exact, in this format:
Perhaps a block sequence is the same but at different times on different Screens. In Excel you can easily copy and paste sequences per screen or per timespan, and save the file for import and/or re-use. To save errors, start by copying and pasting template names from StackSignage into Excel.
To import your file, select the Daylist from the list to enter Edit, and use the toolbar button ‘Import CSV’:
Find your file, import it, and the Daylist will become populated.
Page edited [d/m/y]: 20/01/2023